Before heading straightly to the beautiful country of Mexico to deliver equipment components for this country's largest oil refinery project under construction named Dos Bocas, MV JUMBO KINETIC stopped at PTSC Phu My Port to receive 5 oversize-and-overweight components of this project with their total weight of around 2,100 tons (out of the total weight of all cargoes loaded onto the vessel nearly 4,800 tons).
The biggest components were fabricated and combined by POSCO E&C VIETNAM at PTSC Phu My Port from July 2021 to April this year. Then the inland transportation by SPMT and loading of these structures & other smaller ones (brought from POSCO's factory) on MV JUMBO KINETIC were successfully carried out from April 10 to April 20.
The transportation and loading work went smoothly according to the plan of the parties including POSCO E&C VIETNAM, PTSC Phu My Port, Vietranstimex, and the relevant ones.
This event marks the 15th year of experience of PTSC Phu My Port since its establishment in providing yard/lifting equipment leasing, transportation and loading services for heavy-lift cargoes with the requirements of safety, and sophisticated techniques.
INLAND TRANSPORTATION AND LOADING FOR HEAVY-LIFT CARGOES
|
INLAND TRANSPORTATION AND LOADING FOR HEAVY-LIFT CARGOES
|